For Designers & Architects

Design files, material review, and direct project coordination.

A practical project portal for interior designers, architects and specification teams. Review material, documentation and production requirements before quotation.

01Made to order

Project-specific dimensions, quantity and destination are reviewed before quotation.

02Material approved first

The selected stone becomes the production material reference for the approved order.

03Technical coordination

Drawings, mounting, electrical requirements and finishes are reviewed before fabrication.

04Final QC before dispatch

Completion evidence is shared before final balance and shipment.

Project Workflow

From specification to production.

OYLIN coordinates the material and technical information needed to move a made-to-order project from initial review to fabrication.

01

Project review

Design or reference, quantity, dimensions, destination and intended installation are reviewed first.

02

Material & technical approval

Stone, finish, electrical requirements and relevant drawings are confirmed before production.

03

Production

Production begins after the deposit is received and final project specifications are approved.

04

Final QC & dispatch

Completion evidence is reviewed before the remaining balance and shipment.

Professional Documentation

Information prepared around the approved project.

Dimension and structural drawings

Electrical and mounting information

Material and finish confirmation

3D / visual references where available

Final QC documentation

Packing and shipment information

Available files depend on the design and project stage. Final manufacturing details are confirmed before production.

Before specification

Questions design teams usually need answered early.

Can OYLIN work from architectural drawings?+

Yes. Plans, elevations, reference images and project notes can be reviewed as part of the project brief.

Can dimensions, stone and finishes be customized?+

Yes, where technically feasible. Dimensions, material direction, metal finish and electrical requirements are reviewed project by project.

How is natural stone approved?+

Material families and samples can guide the initial direction. The stone proposed for the approved order is reviewed separately before fabrication.

When does production begin?+

Production starts after the 50% deposit is received and the final material and technical specifications are approved.

What is the typical production lead time?+

Lighting and larger furniture are typically approximately 8–9 weeks after deposit and final approval. Decorative objects and trays are typically approximately 6–7 weeks.

What happens before dispatch?+

Final QC evidence is shared before the remaining balance and shipment.

Ready to review a project?

Send plans, reference images, approximate dimensions, quantity and installation region. OYLIN will review feasibility, material requirements and the next useful step before quotation. Typical response: within 2 business days.

Start a project inquiry