Made-to-Order Reservation
MADE TO ORDER · RESERVATION DESK
Reserve an OYLIN design
OYLIN designs are presented as a design collection and produced specifically for each confirmed order. They are not held as finished stock.
Payment schedule
- 50% production deposit: due after specification review and order confirmation.
- 50% balance: invoiced when production and quality review are complete. Dispatch begins only after the balance clears.
Production timing
Standard target: approximately 8 weeks from cleared deposit and final approval of finish, voltage, plug and drawings. Natural-material selection or project revisions can change the schedule; any change is confirmed in writing.
Rush scheduling: USD 100. Subject to material and workshop capacity, the target dispatch may be brought forward by approximately 2 weeks. Rush availability must be confirmed before payment and does not override approval delays or force-majeure events.
How we keep you informed
- Reservation and deposit confirmed
- Specification/shop-drawing approval
- Material and finish confirmation
- Production start
- Mid-production update
- Final QC photographs and balance invoice
- Dispatch and tracking
Made-to-order return policy
Because production begins to the confirmed specification, made-to-order and customized products cannot be cancelled, returned or exchanged after production starts, except where goods arrive damaged, materially defective, materially different from the approved specification, or applicable law provides otherwise. Report transit damage promptly with packaging and product photographs.
Send a reservation request
Use the contact form below and include the product name/SKU, quantity, destination country, voltage/plug, finish, requested delivery date and whether rush scheduling is requested. The atelier will reply with a specification summary and secure deposit instructions.
No production begins until the deposit has cleared and specifications are approved in writing.
Metal choice
- Standard: engineered metal hardware with ABRS antique-brass finish, included.
- Solid brass upgrade: USD 100. Subject to component feasibility, revised shop drawing and finish approval.
Solid brass and rush scheduling are separate USD 100 options. Selecting both adds USD 200.
State “Standard ABRS” or “Solid Brass Upgrade” in your reservation request.